Performing basic & detail design, program development,
system integration and conducting of FAT & SAT for DCS and ESD
Field
Power generation, chemical and water & waste water treatment plant
Services
- Production and integration of hardware and software
- Building and conversion of control strategy (loop & logic)
- Implementation of control loop
- Implementation of control logic
- Generation of DB and graphics
- Generation of alarm & event system
- Implementation of data storage system
- Implementation of system networking
- Implementation of Interface
- Design of installation and cabling
- Test & site commissioning
- Calculation of efficiency
- Integration of Hardware
-
- Integration of controller (DCS, PLC, ESD) and I/O
- Implementation of control system network
- Production of power distribution system
- Production of marshalling panel
- Integration of software
-
- Program & configuration of loop
- Program & configuration of logic
- Interface of third party system
- Integration of hardware
-
- Industrial workstation
- Industrial rigid console
- Integration of software
-
- Operator workstation software of DCS, PLC, ESD
- Historian
- Report station
- Integration of Hardware
-
- Industrial control network system
- Industrial wireless network system
- Integration of software
-
- NMS(Network Management Software)
Order | Duration of project | Name of project | Performance | Clients |
---|---|---|---|---|
1 | 2023.09 ~ until now | Gumi CCPP GTC Project | GT Cabinet / FAT Service | CGN |
2 | 2023.04 ~ until now | YEOSU G1-C3 Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | LOTTE GS Chemical |
3 | 2023.02 ~ 2025.06 | Eumseong LNG Power Plant Unit 1 DCS & RtPGMS | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | POSCO E&C |
4 | 2022.12 ~ 2023.12 | SANGJU S3 Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | SK Specialty |
5 | 2022.10 ~ 2026.10 | DaeRyun Cogeneration Plant DCS Upgrade | DCS System Upgrade | Daeryun Engery |
6 | 2022.10 ~ 2023.09 | ULSAN KIPA Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | SK geo centric |
7 | 2022.06 ~ 2022.12 | DCS System Upgrade | DCS System Upgrade | Daeryun Engery |
8 | 2022.05 ~ 2022.11 | DaeJeon Cogeneration Plant SER Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | Daejeon Power |
9 | 2021.11 ~ 2022.08 | KDHC Cheongju CHP GT Panel | GT Cabinet / FAT Service | KDHC |
10 | 2021.11 ~ 2022.07 | KDHC Daegu CHP GT Panel | GT Cabinet / FAT Service | KDHC |
11 | 2021.07 ~ 2021.12 | Saudi Tihama Cogeneration Plant (JGP/SGP/UGP) | DCS System Upgrade | TIHAMA Power |
12 | 2021.04 ~ 2021.12 | DaeJeon Cogeneration Plant DCS Upgrade | DCS System Upgrade | Daejeon Power |
13 | 2021.01 ~ 2021.02 | Kuwait AZ-Nour North IWPP DCS Upgrade | DCS System Upgrade | Hyundai Electric |
14 | 2021.01 ~ 2023.01 | Algeria OUMACHE III CCPP Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | HYUNDAI E&C |
15 | 2020.11 ~ 2021.08 | COSMO AM&T NCM Project | PLC Cabinet / PLC Engineering / FAT Service / Site Commissioning | DYPNF |
16 | 2020.08 ~ until now | Ghana TAKORADI CCPP DCS Upgrade | DCS System Upgrade | TAKORADI power |
17 | 2020.05 ~ 2023.11 | Taiwan NPC MM Industrial Incinerator | PLC Cabinet / PLC Engineering / FAT Service / Site Commissioning | Daejeon Power |
18 | 2019.12 ~ 2020.11 | Ulsan #4 CCPP Upgrade Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | EWP |
19 | 2019.11 ~ 2021.02 | Saudi PP11 CCPP Upgrade Project | DCS System Upgrade | DHURUMA O&M |
20 | 2019.04 ~ 2020.08 | China Wuxi SK Hynix M8 Semiconductor Project | SCADA Cabinet / SCADA Engineering / Site Commissioning | SK Hynix |
21 | 2019.07 ~ 2020.08 | Taiwan Chung-Tai Incinerator | PLC Cabinet / DCS Engineering / FAT Service / Site Commissioning | KC Cottrell |
22 | 2018.12 ~ 2019.12 | Ulsan #2, #3 CCPP Upgrade Project | DCS System Upgrade | EWP |
23 | 2018.08 ~ 2018.11 | Hyundai Oilbank Coke Silo Package | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | DongYang |
24 | 2017.03 ~ 2019.11 | Shin Pyeongtaek CCPP Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | Daewoo E&C |
25 | 2017.03 ~ 2017.12 | Indonesia Grati Add-on Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | Doosan |
26 | 2015.06 ~ 2016.03 | Hyundai Oilbank #10 FBC Boiler Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | HYUNDAI E&C |
27 | 2016.06 ~ 2019.10 | Indonesia Grati Block-3 Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | Lotte E&C |
28 | 2015.05 ~ 2017.09 | UAE MIRFA 1600MW IWPP Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | HDEC |
29 | 2015.02 ~ 2017.09 | Malaysia TNB Fast Track 3A Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | Daelim E&C |
30 | 2014.02 ~ 2016.11 | Kuwait Az-Zour North IWPP Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | HHI |
31 | 2013.06 ~ 2015.12 | Saudi TIHAMA Co-Gen (JGP/SGP/UGP/RTR) | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | HHI |
32 | 2014.11 ~ 2015.08 | Pakistan FFBL BLR BMS&BPS Project | TMR Cabinet / TMR Engineering / FAT Service / Site Commissioning | HHI |
33 | 2014.07 ~ 2014.09 | Dangjin FHS Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | VALMET |
34 | 2014.06 ~ 2015.09 | Ghana CIPREL 4B Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | HHI |
35 | 2014.01 ~ 2014.09 | Bangladesh Ashuganj Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | Siemens |
36 | 2013.12 ~ 2014.03 | SAMCHEOK Project | FAT Service | Siemens |
37 | 2013.07 ~ 2014.12 | Taean 9,10 Thermal Power Project | PLC Cabinet / PLC Engineering / FAT Service / Site Commissioning | Rockwell |
38 | 2013.07 ~ 2013.09 | IRAQ H1202 DGS Project | PLC Cabinet / PLC Engineering / FAT Service / Site Commissioning | Rockwell |
39 | 2013.04 ~ 2014.07 | Cote d’lvoire TAKORADI CCPP Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | HHI |
40 | 2012.06 ~ 2013.02 | Pyeongtaek #2CC CCPP Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | Daelim E&C |
41 | 2012.06 ~ 2013.02 | Ulsan #4CC CCPP Project | DCS Cabinet / DCS Engineering / FAT Service / Site Commissioning | Daelim E&C |