Performing basic & detail design of systems, program development,
system integration and FAT & SAT of ECMS and SCADA
Field
Electricity, gas, heat and water & waste water plant
Services
- Production and integration of system hardware
- Integration of software
- Design of communication between RTU and bay controller
- Analysis of efficiency of communication
- Generation of DB of master station
- Generation of graphics
- Generation of DB & logic of RTU
- Implementation of data storage system
- Implementation of System networking
- Implementation of Interface with third party system
- Implementation of network modeling software
- Engineering of protecting device
- Logic design of Bay control
- Calculation capacity of CT, PT
- Short current calculation
- Design of installation & cabling
- Test & site commissioning
- Integration of hardware
-
- Integration of SCADA server, Front-End processor, RDBMS server, modeling server
- Integration of network system
-
- Industrial network system
- Industrial wireless network system
- NMS(Network Management Software)
- Integration of software
-
- Implementation of SCADA system software
- Implementation of modeling software
- Implementation of demand forecasting software
- Hardware
-
- Integration of RTU, bay controller and protecting device
- Integration of communication interface device
- Software
-
- Implementation of logic
- Configuration of communication driver
- Configuration of RTU DB
순 | 수행 기간 | 사 업 명 | 과업 내용 | 발 주 처 |
---|---|---|---|---|
1 | 2019.07 ~ 2020.12 | China Wuxi M8 Semiconductor Factory SCADA | SCADA Manufacturing, Site Commissioning | LS Electric Dalian |
2 | 2019.06 ~ 2020.03 | China Wuxi M8 Semiconductor Factory BAS | BAS Manufacturing, Site Commissioning | Samil Data System |
3 | 2019.06 ~ 2020.08 | China Wuxi M8 Semiconductor Factory UPW | UPW Program, Site Commissioning | VEOLIA China |
4 | 2019.04 ~ 2020.08 | China Wuxi M8 Semiconductor Factory PLC | PLC Manufacturing, Site Commissioning | Hanyang ENG |